Short line rail testing is governed by 49 CFR Part 213, and the rule is narrower than most small owners expect: internal rail inspections under 213.237 are required only on Class 3, 4 and 5 track. Class 1, Class 2 and excepted track carry no rail test interval, and a true plant railroad is outside Part 213 altogether.
A note on the text. The rule wording below was read on November 18, 2026. Sections 213.4 and 213.5 were last amended on July 1, 2025 (90 FR 28136, an address update), and 213.237 has not changed since the 2014 rule. Check the current text of 49 CFR Part 213 on eCFR before writing it into a contract or a budget.
What rules govern short line rail testing?
Short line rail testing follows the same 49 CFR Part 213 as a Class I railroad's, because Part 213 applies by track, not by the size of the company. The words "short line" and "Class III" appear nowhere in Part 213 (full-text search of the 2025 CFR). What decides an owner's duties is the class of each track segment, which the owner sets by the speed it chooses to run under 49 CFR 213.9.
| Track designation | Maximum freight speed | Maximum passenger speed | Internal rail test interval in 213.237? |
|---|---|---|---|
| Excepted track | 10 mph | Not allowed (no occupied passenger trains) | No |
| Class 1 | 10 mph | 15 mph | No |
| Class 2 | 25 mph | 30 mph | No |
| Class 3 | 40 mph | 60 mph | Yes |
| Class 4 | 60 mph | 80 mph | Yes |
| Class 5 | 80 mph | 90 mph | Yes |
Most small railroads sit in the top three rows. When FRA wrote the current rail testing rule in 2014, it counted 738 Class III railroads and found that only 58 of them owned Class 3, 4 or 5 track (79 FR 4234). That is about 8 percent. For the other 92 percent, 213.237 set no test date at all.
Those owners still have federal duties. The sections below take four questions in turn: whether Part 213 reaches the track, what excepted status changes, what Class 1 and 2 track still owes, and when a rail test becomes mandatory.
Key takeaway: find the class of each segment first; the rail testing duty follows the class, not the railroad.
Does Part 213 apply to your industrial track?
Part 213 applies to "all standard gage track in the general railroad system of transportation" (213.3(a)), so the question for an industrial owner is whether its track is part of that system. Section 213.3(b) lists three exclusions: plant railroads, tourist operations off the general system, and urban rapid transit not connected to it.
The plant railroad exclusion is the one industrial owners rely on, and it has a precise definition. A plant railroad is a plant or installation that "owns or leases a locomotive, uses that locomotive to switch cars throughout the plant or installation, and is moving goods solely for use in the facility's own industrial processes" (213.3(b)(1)). Two sentences in the same paragraph take the exclusion away:
- A plant that switches or moves cars "for other entities", even inside its own fence, is not a plant railroad.
- The exclusion "does not apply to track over which a general system railroad operates, even if that track is located within a plant railroad."
The second point catches many plants. If the serving railroad's crew and locomotive come through the gate to set out and pull cars, the track they run on is covered by Part 213, and the plant is the track owner. FRA's policy statement on its jurisdiction says so directly:
"The plant railroad itself, however, does not get swept into the general system by virtue of the other railroad's activity, except to the extent it is liable, as the track owner, for the condition of its track over which the other railroad operates during its incursion into the plant." (49 CFR Part 209, Appendix A)
A switch connection alone does not decide it. The same appendix says that "trackage within an industrial installation that is connected to the network only by a switch for the receipt of shipments over the system is not a part of the system."
| Situation | Is the track under Part 213? | Basis |
|---|---|---|
| Short line main track, branch or yard, any size of railroad | Yes | 213.3(a) |
| Plant track switched only by the plant's own locomotive, for its own processes | No | 213.3(b)(1) |
| Plant track that the serving railroad's crews operate over | Yes, for that track; the plant is the owner | 213.3(b)(1), last sentence; Part 209 App. A |
| Plant that switches cars for a neighboring industry | Yes; it is not a plant railroad | 213.3(b)(1) |
| Leased track next to the plant, used only for the plant's cars under an exclusive-use lease | Can be treated as part of the plant | 213.3(b)(1); Part 209 App. A |
The exclusion is FRA's choice, not a gap in its authority. In its 1998 rewrite of the Track Safety Standards, FRA said it "declines to exercise its jurisdiction over plant railroads at this time" and that it "continues to have safety jurisdiction over those railroads and may invoke its statutory emergency authority" (63 FR 33992). A sidetrack agreement with the serving railroad may also set a standard for plant track; read it.
Key takeaway: draw a line on the plant map where the serving railroad's crews stop; Part 213 applies up to that line.
What does excepted track under 213.4 excuse, and what does it not?
Excepted track is relieved of Subparts B, C, D and E of Part 213, which hold the roadbed, geometry and track structure limits, but it still has to be inspected and it comes with eight conditions. The relief is in 213.5(b): operations may continue over excepted track "without complying with the provisions of subparts B, C, D, and E of this part, unless otherwise expressly stated." The conditions are in 49 CFR 213.4.
| 213.4 paragraph | Condition for excepted track |
|---|---|
| (a) | The segment is identified in the timetable, special instructions, general order or other records available for inspection |
| (b) | It is not within 30 feet of an adjacent track that can be used at the same time at more than 10 mph |
| (c) | It is inspected under 213.233(c) and 213.235 at the Class 1 frequency |
| (d) | It is not on a bridge, within 100 feet of one, or on a public street or highway, if cars with placarded hazardous materials move over it |
| (e)(1) | No train runs faster than 10 mph |
| (e)(2) | No occupied passenger train runs on it |
| (e)(3) | No freight train carries more than five cars required to be placarded |
| (e)(4) | Gage is not more than 4 feet 10 1/4 inches |
Excepted does not mean uninspected. Paragraph (c) keeps the Class 1 visual inspection schedule and the monthly switch inspection, and 213.241(b) requires a signed record of each one, kept for at least a year.
Hazardous materials are limited, not banned. The limit is five placarded cars in a train, plus the bridge and public street condition in paragraph (d). FRA rejected a full ban in 1998 because many short lines on excepted track haul hazardous materials regularly.
The status can't be switched off for a day. Under 213.4(f) the owner must tell FRA's Track and Structures Division at least 10 days before removing a segment from excepted status. FRA added that notice to stop railroads lifting the status just long enough to run an excursion train (63 FR 33992).
FRA explained the purpose of the category in the same rule:
"It allows railroads to continue to use, on a limited basis, low-density trackage that does not earn sufficient revenue to justify the expense of maintaining it to higher track standards." (63 FR 33992, June 22, 1998)
Because Subpart D is one of the excused subparts, the defective rail rule in 213.113 does not bind excepted track. A defective rail found there is managed under the owner's own standard.
Key takeaway: excepted status trades the track standards for speed, traffic and location limits, and the inspections and records stay.
Which Part 213 duties still apply on Class 1 and 2 track?
Class 1 and 2 track owes everything in Part 213 except the internal rail test interval: designated inspectors, visual inspections, switch inspections, records, the geometry and tie limits for its class, and the defective rail rule. A small owner's budget must cover these first, because they recur every week or month.
| Duty | What it requires on low-class track | Section |
|---|---|---|
| Designated persons | The owner designates qualified people to inspect track and to supervise repairs, and keeps a record of each designation and its basis | 213.7 |
| Visual inspection, main track and sidings | Weekly, at least 3 calendar days apart, or before use if the track is used less than once a week | 213.233(c) |
| Visual inspection, other track | Monthly, at least 20 calendar days apart | 213.233(c) |
| Switches, turnouts and track crossings | On foot at least monthly, or before use if the track is used less than once a month | 213.235 |
| Inspection records | Prepared the day of the inspection, signed or certified, kept at least one year | 213.241(b) |
| Gage | At least 4 ft 8 in.; not more than 4 ft 10 in. on Class 1 or 4 ft 9 3/4 in. on Class 2 | 213.53 |
| Crossties | In each 39 feet of tangent track, at least 5 crossties that pass the rule's condition tests on Class 1 and 8 on Class 2 | 213.109 |
| Joints | At least one bolt per rail at each joint on Class 1 and two on Class 2 jointed track | 213.121 |
| Defective rail | Remedial action once the owner learns of a listed defect | 213.113 |
| Noncompliance | Fix it, stop operations, or run under a 213.7(a) person | 213.5(a) |
The weekly schedule tightens to twice weekly on Class 1 to 3 track that carries passenger trains or more than 10 million gross tons in the previous calendar year.
Track that can't meet Class 1 may stay in use at Class 1 speeds for not more than 30 days under a 213.7(a) person (213.9(b)). After that the owner must repair it or, if every 213.4 condition is met, designate it excepted.
The 213.113 row matters for testing. The duty starts "when an owner of track learns that a rail in the track contains any of the defects listed", however the owner learns it. A rail flaw found by a voluntary ultrasonic test on Class 2 track gets the same remedial action as one found on Class 4.
Key takeaway: on Class 1 and 2 track the federal cost is inspection labor and records, not rail testing.
When does 213.237 require internal rail testing on a short line?
49 CFR 213.237 requires internal rail inspections once a segment is Class 3 or higher, and the interval depends on what the track carries. The rule states the looser schedule this way:
"Internal rail inspections on Class 3 track that is without regularly-scheduled passenger trains and not a hazardous materials route must be inspected at least once each calendar year, with no more than 18 months between inspections, or at least once every 30 mgt, whichever interval is longer, but in no case may inspections be more than 5 years apart." (49 CFR 213.237(c))
| Short line segment | Rail test duty under 213.237(c) |
|---|---|
| Excepted, Class 1 or Class 2 | None |
| Class 3, no scheduled passenger trains, not a hazardous materials route | Once each calendar year (no more than 18 months apart) or every 30 MGT, whichever is longer, never more than 5 years apart |
| Class 3 with regularly scheduled passenger trains, or a hazardous materials route | Every 370 days or 30 MGT, whichever is shorter |
| Class 4 and 5 | Every 370 days or 30 MGT, whichever is shorter |
"Whichever is longer" decides the answer on light-density track. A Class 3 line carrying 3 MGT a year needs 10 years to reach 30 MGT, which is longer than one calendar year, so the 5-year cap governs. The legal minimum on that line is one valid test every five years.
Three triggers move a Class 3 short line onto the stricter 370-day schedule:
- A hazardous materials route. The definition is track that carries at least 10,000 car loads of hazardous materials in a calendar year, or 4,000 car loads of the materials listed in 49 CFR 172.820 (213.237(j)(1)). One large chemical customer can be enough.
- Regularly scheduled passenger trains. Section 213.237 has no footnote for tourist or excursion trains like the one in 213.233(c). An owner hosting a scheduled excursion on Class 3 track should confirm its status with FRA.
- A speed increase. Raising a segment from 25 mph to 40 mph makes it Class 3 and starts the testing duty.
Where a test is required, the rest of the rule comes with it. The operator must be qualified under 213.238, only a valid search counts, any plug rail must have been tested (213.237(c)(1)), and the record must hold the six items in 213.241(c). Those parts are explained in our guides to 49 CFR 213.237 and rail flaw detection records under 213.241. The full interval table for every class is in how often rail must be tested.
Key takeaway: a freight-only Class 3 short line can lawfully go five years between rail tests; passenger service or a hazardous materials route cuts that to 370 days.
Why test rail that the rule doesn't require you to test?
Because most broken-rail derailments are reported on the track 213.237 leaves out. FRA's accident database lists 1,288 derailments from 2016 to 2025 with a primary cause in the "Broken Rail" group of cause codes (query of November 18, 2026).
| FRA track class reported | Broken-rail derailments, 2016 to 2025 | Share |
|---|---|---|
| Excepted (coded X) | 110 | 8.5% |
| Class 1 | 859 | 66.7% |
| Class 2 | 141 | 10.9% |
| Class 3 to 6 | 178 | 13.8% |
| Total | 1,288 |
Excepted, Class 1 and Class 2 track together account for 1,110 of the 1,288 reports, or 86 percent. By track type, 736 were on yard track and 128 on industry track.
These are counts, not rates, and they need context. They cover railroads of every size, and they say nothing about severity: a yard derailment at 10 mph and a main-line derailment at 40 mph each count as one. FRA made the same judgment about excepted track in 1998, noting 87 track-caused reportable accidents on 8,000 to 9,000 miles in five years (63 FR 33992).
For a small owner the practical reasons to test are local:
- Old and relay rail. FRA noted in 1998 that many short lines operate over track acquired just before a major railroad would have abandoned it. See our guide to relay rail inspection.
- One way in. A plant with a single lead loses all rail service while a derailment is cleared.
- Defect history. A segment that has already had a broken rail or a cut-out defect is the first candidate for a test.
- A planned speed increase. Test before raising a segment to Class 3.
On Class 1 and 2 track, every defect a voluntary test finds starts 213.113, so budget the repairs along with the test.
Key takeaway: test low-class track because of what a broken rail would cost you, and plan the repairs before the test car arrives.
Worked example: a 30-mile short line
Every input here is an assumption for illustration. The contractor rates are the 2019 rates in a San Diego MTS rail testing contract, one of the few public unit rates available; a short line's own quotes will differ. FRA's 2014 estimate for a small railroad was lower, $2,000 a day to rent a rail flaw detector car, with no mobilization line.
| Input | Assumed value | Basis |
|---|---|---|
| Segment A | 18 track miles, Class 3 main, 3 MGT a year, freight only, not a hazardous materials route | Assumption |
| Segment B | 9 track miles, Class 2 branch | Assumption |
| Segment C | 3 track miles of excepted yard and industry track, 24 switches on the railroad | Assumption |
| Production rate | 15 track miles per test day on jointed, light-density track | Assumption; ask bidders for theirs |
| Test-day rate | $3,100.73 per 8-hour day | SDMTS 2019 contract rate |
| Mobilization | 2 travel days at $2,847.08 = $5,694.16 per visit | SDMTS 2019 rate; days assumed |
Step 1: what must be tested. Only Segment A. At 3 MGT a year, 30 MGT takes 10 years, so the 5-year cap governs. Segments B and C have no interval.
Step 2: price one visit. 18 ÷ 15 = 1.2, rounded up to 2 test days.
- Test days: 2 × $3,100.73 = $6,201.46
- Mobilization: $5,694.16
- Visit total: $11,895.62
Step 3: compare three programs.
| Program | Miles tested | Test days | Cost per visit | Annual cost | Per mile tested |
|---|---|---|---|---|---|
| 1. Legal minimum: Segment A every 5 years | 18 | 2 | $11,895.62 | $2,379.12 | $660.87 |
| 2. Segment A every year | 18 | 2 | $11,895.62 | $11,895.62 | $660.87 |
| 3. Segments A and B every year | 27 | 2 | $11,895.62 | $11,895.62 | $440.58 |
Program 3 costs the same as Program 2, because the 9-mile branch fits inside the second test day (27 ÷ 15 = 1.8 days). On a small railroad the price of a visit is set by whole days and by mobilization, which is 48 percent of this bill ($5,694.16 of $11,895.62).
Step 4: count the inspections the rule requires every year. These are the owner's own labor and do not depend on the testing program.
| Inspection | Count per year | Rule |
|---|---|---|
| Visual, Segments A and B (main track) | 52 each, weekly | 213.233(c) |
| Visual, Segment C (other than main track and sidings) | 12, monthly | 213.233(c); 213.4(c) |
| Switches, on foot | 24 switches × 12 = 288 | 213.235 |
Program 1 leaves 18 miles of Class 3 rail untested for up to five years and 12 miles never tested. Whether that is acceptable is an engineering judgment, not a compliance question.
Worked example: a 4-mile plant lead
Again, every input is an assumption. A plant owns 4 track miles: a lead from the interchange switch and the loading and storage tracks inside the fence. The plant owns a switching locomotive and moves only its own product.
Step 1: draw the line. The serving railroad's crews run 2.2 miles, from the interchange into the receiving tracks. The plant's locomotive alone uses the other 1.8 miles.
| Track | Part 213? | Why |
|---|---|---|
| 2.2 miles used by the serving railroad | Yes; the plant is the track owner | 213.3(b)(1), last sentence |
| 1.8 miles switched only by the plant | No | Plant railroad, 213.3(b)(1) |
Step 2: choose a designation for the 2.2 miles. Trains run at 10 mph or less, so the plant can run it as Class 1, or as excepted track if all eight 213.4 conditions hold. Assume it qualifies: no placarded cars, no bridge, no adjacent faster track.
Step 3: list the duties. Suppose the 2.2 miles hold 6 switches and are not main track or sidings.
- Designate a qualified person under 213.7 to inspect the track, and record the basis.
- Identify the excepted segment in the plant's records (213.4(a)).
- Inspect the track monthly: 12 inspections a year.
- Inspect each switch on foot monthly: 6 × 12 = 72 a year.
- Keep signed records for one year (213.241(b)), and hold gage to 4 feet 10 1/4 inches.
No rail test is required on any of the 4 miles.
Step 4: price a voluntary rail test. All 4 miles fit in one test day.
| Line | Calculation | Cost (2019 rates) |
|---|---|---|
| Test day | 1 × $3,100.73 | $3,100.73 |
| Mobilization | 2 × $2,847.08 | $5,694.16 |
| Visit total | $8,794.89 | |
| Per track mile | $8,794.89 ÷ 4 | $2,198.72 |
| Annual cost if tested every 3 years | $8,794.89 ÷ 3 | $2,931.63 |
Mobilization is 65 percent of the visit. If the plant's test is booked onto the same trip as the short line above, the tester adds one day and no travel: $3,100.73, or $775.18 a mile, which saves the plant $5,694.16.
How should a small owner budget for rail testing?
Budget in this order: the inspections the rule requires every week and month, then the rail test the rule requires, then the rail test your own risk calls for. A five-line worksheet covers most small owners.
- Map each segment by ownership, who operates over it, class or excepted status, annual tonnage, passenger trains and hazardous materials car loads.
- Count the recurring inspections under 213.233 and 213.235 and price the designated inspector's hours.
- Set the required rail test dates for Class 3 to 5 segments under 213.237(c), including the 5-year cap.
- Decide the voluntary program for the remaining rail, and set aside repair money for what it finds.
- Price visits, not miles. Ask for a test-day rate, a mobilization charge, a production rate on track like yours, and what the report includes.
Whether to qualify your own operator or hire a provider is covered in in-house vs outsourced rail inspection. The cost drivers behind a quote, with the public contract figures, are in ultrasonic rail testing cost.
Where the test is voluntary, 213.238 and 213.241(c) do not strictly bind, because they attach to inspections 213.237 requires. Write them into the purchase order anyway: a qualified operator, a list of rail not validly tested, and a located defect list. A report without them is weak evidence of the rail's condition if the segment later moves to Class 3.
What the Part 213 minimums don't cover
Part 213 sets "minimum safety requirements" (213.1(a)); it does not tell a small owner how much testing its rail needs.
- It names no test method. The word "ultrasonic" does not appear in Part 213. The rule asks for an internal rail inspection and a valid search.
- It sets no rail test on low-class track, where 86 percent of broken-rail derailment reports arise.
- It excuses excepted track from 213.113, so a known defect there has no federal remedial action.
- It does not reach true plant railroads, though FRA keeps its emergency authority.
- A test finds what the beam can reach. Testing from the rail head covers the head, the web and the part of the base directly under the web, and heavy surface damage on old rail can leave lengths with no valid search.
- Other rules sit beside Part 213. On general-system track, the on-track safety rules of 49 CFR Part 214 apply to the test crew.
The whole of Part 213, including geometry, enforcement and the defective rail table, is explained in our guide to the FRA track safety standards.
How EMA Industries applies this
EMA Industries provides hyrail ultrasonic rail flaw detection and manual rail scanning for short lines, industrial track owners and transit agencies, with NDT Level III technical support. The company is based in Southern California and mobilizes for projects throughout the United States. For a small owner, the first step is the segment map described above: which track Part 213 reaches, which segments 213.237 dates, and which rail is worth testing by choice. To scope a test visit for a short line or a plant lead, see our ultrasonic rail testing services or contact EMA Industries.
Related reading: FRA track safety standards (Part 213) · In-house vs outsourced rail inspection · Ultrasonic rail testing cost · How often rail must be tested
Frequently asked questions
Does 49 CFR Part 213 apply to industrial track?
It applies to industrial track that is part of the general railroad system, and to any plant track that a general-system railroad operates over. Track inside a plant that only the plant's own locomotive uses, for the plant's own processes, is a plant railroad and is excluded by 213.3(b)(1). Where the serving railroad's crews enter the plant, the plant is the track owner for that track.
How often must a short line railroad test its rail?
Only Class 3, 4 and 5 track has an interval. Freight-only Class 3 track that is not a hazardous materials route must be tested once a calendar year or every 30 MGT, whichever is longer, and never more than 5 years apart. Class 3 track with scheduled passenger trains or a hazardous materials route, and all Class 4 and 5 track, must be tested every 370 days or 30 MGT, whichever is shorter.
What inspections does excepted track still need?
Excepted track needs the same visual inspections as Class 1 track under 213.233(c), and a monthly on-foot inspection of each switch under 213.235. Each inspection needs a signed record kept for at least one year.
What happens if a voluntary rail test finds a defect on Class 1 or 2 track?
Section 213.113 applies as soon as the owner learns of a listed defect. A person designated under 213.7 must decide whether the track can stay in use, and the rail must be replaced, repaired or put under the remedial action in the 213.113 table.
What does rail testing cost for a small railroad?
FRA's 2014 estimate was $2,000 a day to rent a rail flaw detector car, or $6,000 a year for an average 70-mile Class III railroad. A 2019 transit contract priced a test day at $3,100.73 and a travel day at $2,847.08. On a few miles of track, mobilization can be the largest line, so sharing a visit with a neighboring owner lowers the price.
Sources
- 49 CFR 213.3, Application (eCFR); text read on Cornell LII, November 18, 2026
- 49 CFR 213.4, Excepted track (eCFR); Cornell LII
- 49 CFR 213.5, Responsibility for compliance (eCFR); Cornell LII
- 49 CFR 213.9, Classes of track: operating speed limits (eCFR); Cornell LII
- 49 CFR 213.1, 213.7, 213.53, 213.109, 213.113 and 213.121 (Cornell LII)
- 49 CFR 213.233, Visual track inspections (eCFR) and 213.235, Inspection of switches (eCFR)
- 49 CFR 213.237, Inspection of rail (eCFR); Cornell LII
- 49 CFR 213.238, Qualified operator (eCFR) and 213.241, Inspection records (eCFR)
- 49 CFR Part 209, Appendix A, statement of agency policy on the extent and exercise of FRA's safety jurisdiction (Cornell LII); Part 209 on eCFR
- Federal Railroad Administration, Track Safety Standards, final rule, 63 FR 33992 (June 22, 1998), discussion of 213.3 and 213.4
- Federal Railroad Administration, Track Safety Standards; Improving Rail Integrity, final rule, 79 FR 4234 (January 24, 2014), regulatory flexibility analysis (Class III railroad counts and cost estimate)
- Federal Railroad Administration, Rail Equipment Accident/Incident Data (Form 54), queried November 18, 2026: derailments with a primary cause beginning "Broken Rail", 2016 to 2025, by reported track class and track type
- San Diego Metropolitan Transit System, board agenda and materials, December 13, 2018, item 18: ultrasonic rail testing contract rates for 2019 to 2021
- 49 CFR Part 213, 2025 annual edition, full-text search (govinfo XML) for "short line", "Class III" and "ultrasonic"