CPUC General Order 143-B, 164-F and 175-A: California Light Rail Inspection Requirements
CPUC General Order 143-B sets California light rail track rules; 164-F and 175-A add safety plans and worker protection. What each means for rail inspection.
Category
5 articles
CPUC General Order 143-B sets California light rail track rules; 164-F and 175-A add safety plans and worker protection. What each means for rail inspection.
49 CFR 213.241 requires six items in every internal rail inspection record, kept at least two years. What each item means, plus a sample rail test report.
Rail failure statistics from FRA data: 990 derailments in 2025, 1.85 per million train-miles, and why broken rails and welds lead track-caused main-line wrecks.
A transverse fissure in rail is an internal crosswise crack in the rail head. Causes, 70° UT detection, the 213.113 remedial table and how it differs from a DF.
A rail inspection RFP by track class: 213.237 test intervals, 213.233 visual frequency, excepted track, 213.113 actions and a mixed Class 2/3/4 example.