Ultrasonic railroad testing services follow a set sequence: scoping, a Part 214 job briefing, the test run, verification of each suspect within 4 hours under 49 CFR 213.113(b), marking, a report with the six items 213.241(c) requires, remedial action by the track owner, and records kept for at least two years.
This guide is written for the buyer: the transit engineer, short-line track supervisor or industrial track owner who has hired, or is about to hire, a rail flaw testing contractor. It walks through the engagement in order and says who does what at each step.
Other pages cover the neighboring questions. For what FRA requires of a service and how to scope a quote, see ultrasonic rail testing services in the USA. For the crew's field checklist, see the ultrasonic rail inspection checklist. For equipment and methods, see ultrasonic rail testing capabilities.
In this guide: the engagement timeline · request for quote · the safety briefing · test day · suspect verification and marking · a worked example from 10:40 to disposition · the report · remedial follow-up · records · limits · FAQ
What happens, and when, after you hire ultrasonic railroad testing services?
An engagement has seven stages, and the track owner has duties in every one of them. The contractor finds and verifies defects. The owner decides what happens to the track. The table below sets out the order. The timing column is an example for planning, not a rule.
| Stage | When (example) | Contractor does | Track owner does | Rule |
|---|---|---|---|---|
| 1. Request for quote and scoping | Weeks before the 213.237 due date | Confirms method, crew, equipment and the operator's qualification on it | Supplies segments, class, tonnage, last valid search date, access windows | 213.237(c), 213.238 |
| 2. Pre-job safety briefing and RWP | Start of each shift, before anyone fouls the track | Attends; follows the on-track safety plan | Provides or arranges the roadway worker in charge and track authority | 214.315; Part 214 Subpart C |
| 3. Test day | The scheduled window | Checks the equipment, runs the test, logs suspects and untested stretches | Keeps the window open; answers access questions | 213.237(g), (j)(4) |
| 4. Suspect verification and marking | Within 4 hours of each indication, or immediately for suspected A, A2 or B defects | Hand-tests each suspect, sizes it, marks verified defects | Is notified at once; a designated person decides on continued use | 213.113(a)–(b), 213.237(e) |
| 5. The report | As agreed in the contract | Delivers the defect list, untested track and test details | Checks it against 213.241(c) before accepting it | 213.241(c) |
| 6. Remedial follow-up | Per the lettered remedial action | Retests, verifies repairs, tests replacement rail if contracted | Applies speed limits, joint bars or rail changes; closes untested stretches | 213.113(c), 213.237(h) |
| 7. Records | Storage started within 72 hours; kept 2 years or longer | Supplies data in the agreed format | Keeps the record and makes it available to FRA | 213.241(d), (i), (j) |
Key takeaway: finding a defect is the contractor's job, but every disposition decision belongs to the track owner.
What should you send with a request for quote?
Send the facts that set the interval and the scope: miles by class and segment, annual tonnage, passenger and hazmat status, and the date of the last valid search. The rest of the quote follows from those. A worked short-line quote is in our guide to ultrasonic rail testing services in the USA, so this section only lists what a buyer should expect to provide and to receive.
You provide:
- each segment's milepost limits, track class and track numbers
- annual million gross tons (MGT) and the date of the last valid search, so the contractor can see the due date under 49 CFR 213.237 (on Class 4 and 5 track, 370 days or 30 MGT, whichever comes first)
- the access you can offer: track windows, set-on points for a test vehicle, and who will provide roadway worker protection
- known trouble spots, such as heavy shelling, lubricated curves, recent service failures and plug rail installed since the last test
- who verifies suspects, who receives the call for a serious defect, and the report format and turnaround you need
You should receive:
- the test method for each segment (test vehicle, walking cart or hand testing) and the probe set
- the operator's 49 CFR 213.238 qualification record for the specific equipment that will be used. A general NDT certificate isn't the same thing
- a sample report, so you can check it against 213.241(c) before the job starts
- whether the test will be stop-and-verify or continuous. Under 213.240(c), the owner must designate and record the test type before the test starts on a segment
Key takeaway: a quote that doesn't name the equipment, the operator qualification and the report contents isn't ready to sign.
What happens at the pre-job safety briefing?
Before anyone fouls the track, the roadway worker in charge gives an on-track safety job briefing under 49 CFR 214.315, and every worker must acknowledge it. Fouling means being where a train could strike you, and in any case within 4 ft of the field side of the near running rail (214.7). A test crew on a cart or a hi-rail vehicle is fouling the track for the whole run.
Under 214.315(a), the briefing covers at least five items:
- how on-track safety is provided for each track to be fouled
- each on-track safety procedure to be followed
- adjacent tracks, their protection, and any machines that will foul them
- the work to be done and the characteristics of the work location
- how to reach the roadway worker in charge, and what to do if that person can't be reached
The rule is explicit about when a briefing is finished:
"A job briefing for on-track safety shall be deemed complete only after the roadway worker(s) has acknowledged understanding of the on-track safety procedures and instructions presented." (49 CFR 214.315(b))
Each work group has one roadway worker in charge, who must be qualified under the rules of the railroad that runs trains on that track (214.315(c)). In practice, that means the owner or operating railroad usually provides or approves the protection, and the quote should say who. A moving test vehicle normally needs working limits under exclusive track occupancy, because 214.323(d) bars the movement of on-track equipment into or within limits protected by foul time.
Rail transit is different. Part 214 applies to railroads on the general railroad system. Rail transit agencies also work under their state safety oversight agency, and in California the CPUC's rail transit rules include General Order 175-A on roadway worker protection. Expect the agency's own safety training and permit process before the first shift.
Key takeaway: budget the briefing and track authority into each shift; a test crew can't start until both are in place.
What does the test day look like?
On test day the crew checks the equipment, runs the search with a set of probes at several angles, and logs every suspect and every stretch it couldn't test. Part 213 sets no calibration method or test speed. It requires the qualified operator to determine that the equipment "is performing as intended" (213.238(b)(2)), so the check routine comes from the contractor's procedure.
Which probes does the test use?
The workhorse of rail flaw detection is a set of probes at several angles, carried in fluid-filled wheels or on sleds that ride the rail head with water or another couplant. Exact angles vary by system and manufacturer, so treat this as typical practice:
| Probe angle | Main targets | What it looks for |
|---|---|---|
| 0° (straight beam) | Horizontal split heads, head and web separation, the horizontal part of compound fissures | Reflections from horizontal flaws, and loss of the back-wall (base) echo |
| About 37–45° | Bolt hole cracks and web defects | Angled reflectors in the web, often near holes |
| 70° (forward and backward) | Transverse fissures and detail fractures in the head | Crosswise flaws in the rail head |
| Side-looking (where fitted) | Vertical split heads | Lengthwise flaws in a vertical plane |
Guided-wave testing, which the original version of this page listed as a core method, isn't part of a standard rail flaw test. FRA has funded guided-wave research, but routine 213.237 searches use the pulse-echo probe set above.
What does the operator actually see?
The operator works from an A-scan, which plots echo amplitude against time. The time base gives the sound path, so the depth and position of a reflector can be worked out. The A-scan doesn't show a flaw's shape. Test-car software usually adds a B-scan style map of each channel along the rail, and the size of a suspect is estimated later by hand verification.
When does a test run count?
A run counts only where it was a valid search. Section 213.237(j)(4) defines it:
"Valid search means a continuous inspection for internal rail defects where the equipment performs as intended and equipment responses are interpreted by a qualified operator as defined in § 213.238."
Where coupling is lost, for example on a heavily lubricated curve or under severe surface damage, that stretch isn't inspected (213.237(g)). Expect the crew to log it as untested and tell you the same day. A lost-coupling stretch is untested rail, not a false call.
Key takeaway: ask for the untested-stretch list at the end of each shift, not in the final report.
How are suspect indications verified and marked?
Once the owner learns of an indication, 213.113(b) requires verification within four hours, or immediately if the owner has an indication of a defect needing remedial action A, A2 or B. On a stop-and-verify test, the crew usually stops and hand-tests the suspect on the spot.
"Except as provided in § 213.240, the track owner must verify the indication within four hours, unless the track owner has an indication of the existence of a defect that requires remedial action A, A2, or B identified in the table contained in paragraph (c) of this section, in which case the track owner must immediately verify the indication." (49 CFR 213.113(b))
Verification is a hand test with a portable flaw detector, using the angles that fit the suspected defect. The result is a defect type and a size: percent of head cross-section for transverse defects, inches for split heads and bolt hole cracks. Some suspects turn out to be benign, such as bolt hole geometry or weld profile, and are logged as such.
Each verified defect is marked "with a highly visible marking on both sides of the web and base", or on or next to the head where permanent features block those surfaces (213.237(e)). Then the owner's person designated under 213.7 decides whether the track may stay in use. Under 213.113(a), trains may not run over the defect until the rail is replaced or repaired, or the remedial action in the table is started.
Continuous testing works differently. An owner using continuous rail testing under 213.240 is exempt from 213.113(b). Instead, suspects must be field-verified within 84 hours, or within 36 hours for a suspected A, A2 or B defect. A suspect isn't a defect until a 213.238-qualified person verifies it, and an unverified suspect past its deadline gets the most restrictive remedial action for its type and size.
Key takeaway: the four-hour clock starts when the owner learns of the indication, so agree in advance who the contractor calls.
Worked example: a suspect found at 10:40
This example is hypothetical. It follows one suspect from the first indication to its disposition. The hour-by-hour view of a whole test day is in our inspection checklist.
Inputs: Class 4 freight track, maximum 60 mph under 213.9. Stop-and-verify test on Tuesday, November 10, 2026. The test run ends at 15:30.
| Time | Event | Rule |
|---|---|---|
| 10:40 | The 70° channels show a reflector in the head of the right rail at MP 7.32. No break, no surface sign, no other channel involved. The owner's contact is told by radio | 213.113(b): 4-hour window opens |
| 10:44 | Test vehicle stops and sets back to the location | — |
| 10:55 | Head cleaned; hand test with 70° and 45° probes from both directions | 213.238(b) duties |
| 11:15 | Verified: detail fracture, estimated at 30% of head cross-section | 213.113(d)(7) definition |
| 11:20 | Rail marked on both sides of web and base | 213.237(e) |
| 11:25 | Owner's designated person given type, size and location | 213.113(a) |
| 11:40 | Remedial action D applied: speed over the defect cut from 60 mph to 30 mph or less, and joint bars, bolted only through the outermost holes, due within 7 days | 213.113(c), note D |
| Nov 12 | Owner's crew replaces the defective rail with plug rail that was tested within the last 30 MGT; slow order lifted after the repair | 213.237(c) plug rail |
| By 15:30 Nov 13 | Electronic storage of the inspection record started | 213.241(j)(5) |
Checks on the numbers:
- Verification time. The window ran from 10:40 to 14:40 (10:40 + 4 h). Verification finished at 11:15, 35 minutes after the indication, with 3 hours 25 minutes to spare.
- Remedial action. For transverse fissures and detail fractures, 25% to less than 60% of head area calls for action D, so 30% falls in that band. Action C covers 5% to less than 25%, and 60% to less than 100% calls for A2 or E and H.
- Joint bar deadline. Seven days from November 10 is November 17. Bars applied late would drop the speed to 10 mph. Here the rail was replaced on November 12, so bars weren't needed.
- 72-hour storage. The inspection was completed at 15:30 on November 10, so storage had to begin by 15:30 on November 13.
- Retention. The record is kept for at least two years after the inspection (to November 10, 2028) and one year after the initial remedial action (to November 10, 2027). The later date controls: November 10, 2028.
Two variants change the clock. If the 10:40 indication had suggested a defect needing A, A2 or B, such as a large reflector across several channels or a visible crack, "immediately" replaces the 4-hour window. On a continuous test under 213.240, the same suspect would have to be field-verified within 84 hours (by 22:40 on November 13), or 36 hours (by 22:40 on November 11) if it were a suspected A, A2 or B defect.
What should the inspection report contain?
A usable report lists everything 213.241(c) requires for the owner's record: date, track and limits, each defect's location, type and size, the initial remedial action, and every stretch not validly tested. The table below shows one possible layout with sample entries taken from the worked example. Report formats vary by contractor and owner.
| Report section | Sample entry | Why it's there |
|---|---|---|
| Header | Owner, subdivision, segment ID, MP 0.0 to MP 24.0, main track 1, Class 4 | 213.241(c)(2): track inspected, with beginning and end points |
| Date and test type | November 10, 2026; stop-and-verify, designated before the start | 213.241(c)(1); 213.240(c) if continuous testing is used |
| Equipment and operator | Test system and serial number; probe set 0°, 45° and 70°; operator name and 213.238 qualification on that equipment | 213.237(i), 213.238 |
| Equipment checks | Start and end-of-shift checks on the reference rail passed | 213.238(b)(2); contractor procedure |
| Defects found | MP 7.32, right rail, detail fracture, about 30% of head area, verified 11:15, marked | 213.241(c)(3) and (4) |
| Initial remedial action | Action D, 30 mph, applied 11:40 on November 10, 2026; rail replaced November 12 | 213.241(c)(5) |
| Track not tested | MP 18.60 to MP 18.75, right rail, loss of coupling on a lubricated curve | 213.241(c)(6), 213.237(g) |
| Benign suspects (optional) | MP 12.05, bolt hole geometry, no crack | Not required by Part 213; helps the next test crew |
| Data and storage | Data files in the owner's format; electronic storage started by November 13 | 213.241(j) |
Part 213 sets no deadline for the contractor's report itself. The turnaround belongs in the contract. A continuous test under 213.240(e) must also produce a systematic list of every suspect location, identified so that a qualified person can find and field-verify it.
Key takeaway: if the report doesn't list untested track and defect sizes, you can't build a compliant 213.241 record from it.
Who handles remedial follow-up after the test?
The track owner does. A person designated under 213.7 decides whether the track stays in use, and the owner applies the lettered remedial action from the 213.113(c) table: a speed limit, joint bars, supervision of moves, or rail replacement. The defect types and their actions are explained in our guide to FRA defect codes.
Typical follow-up work, and who usually does it:
| Follow-up item | Usually done by | Rule |
|---|---|---|
| Slow order or protection over each defect | Owner | 213.113(a), (c) |
| Joint bars or rail replacement by the action's deadline | Owner or its track contractor | 213.113(c) notes |
| Testing of replacement plug rail before or after it goes in | Owner, or the testing contractor if contracted | 213.237(c) |
| Valid search, 25 mph limit or rail replacement for each untested stretch, before the interval runs out | Owner, often with a contractor retest | 213.237(h) |
| Inspection of new field welds | Owner's weld inspection procedure | Owner procedure |
| Service failure rate tracking per segment | Owner | 213.237(a), 213.241(e) |
The untested stretches are the item buyers forget most often. Section 213.237(h) gives three choices, and one must be complete before the time or tonnage limit expires: a valid search, a speed limit of 25 mph, or replacement of the rail. Scheduling the test well before the due date leaves room for that retest. The intervals themselves are explained in how often must rail be tested.
How long must rail test records be kept?
At least two years after the inspection and one year after the initial remedial action, under 49 CFR 213.241(d). Both conditions apply, so the later date controls.
The record must be available to FRA for inspection and copying during regular business hours after reasonable notice (213.241(i)). The owner keeps the records and makes them available; it doesn't send them to FRA. They must also be available to the people who did the inspection and to those doing later inspections of the segment (213.241(h)), which is one reason to hand last year's report to this year's contractor.
Electronic records are allowed under 213.241(j) if the system:
- uniquely identifies each author
- prevents a completed record from being changed or replaced
- stores each amendment separately, identified by its author
- has storage started by the person making the inspection within 72 hours of completing it
Owners using continuous testing also keep the 213.241(f) records, such as the time each suspect was identified and field-verified, and file the 213.240(g) annual report within 45 days after each calendar year. That report is the only annual report in Part 213.
What can't an ultrasonic rail test tell you?
A test shows where the rail was validly searched and what was found there. It can't prove the rail is free of defects. These limits belong in every buyer's expectations:
- Surface damage masks defects. Shelling, head checks and spalling scatter or block the beam, and detail fractures start in exactly that damaged area. FRA's 2014 rail integrity rule refers to "the limitations of current technology to detect internal rail flaws beneath surface conditions and in the base flange area" (79 FR 4234).
- Most of the rail base isn't searched by a test vehicle. A TTCI technology digest on thermite welds notes that the process "only scans the head and web of the rail, and not the majority of the base" (TD-00-013). Field welds may need hand testing of the base.
- Cast manganese frogs are hard to test. The coarse grain scatters sound, so in-service examination of those frogs is generally visual.
- Sizes are estimates. Hand verification gives a percent of head area or a length in inches, and the remedial action band depends on it. A defect near a band edge deserves a conservative call.
- Detection isn't 100%. No rule requires it, and no test achieves it. That's why 213.237 pairs the interval with a service failure rate target.
- The test doesn't decide disposition. The contractor reports; the owner's designated person decides under 213.113.
Indications that turn out to be benign are covered in our guide to false calls in rail UT.
How EMA Industries applies this
EMA Industries provides ultrasonic rail flaw testing for transit agencies, short lines and industrial track owners, based in Southern California and mobilizing nationwide, and also offers rail weld inspection. We agree the report contents, the notification contacts and the roadway worker protection arrangements before the first shift, so suspects are verified inside the 213.113(b) window and the owner gets a record that meets 213.241. To plan a test, see our ultrasonic rail testing services or request a quote.
Related reading: 49 CFR 213.237 rail flaw detection requirements · Hi-rail truck vs inspection cart · FRA track safety standards (Part 213)
Frequently asked questions
How quickly must a rail flaw suspect be verified?
Within four hours of the owner learning of it, under 49 CFR 213.113(b), or immediately if the indication suggests a defect needing remedial action A, A2 or B. Owners using continuous testing under 213.240 work to 84 hours instead, or 36 hours for suspected A, A2 or B defects.
Who provides roadway worker protection during ultrasonic rail testing?
The roadway worker in charge must be qualified under the rules of the railroad that runs trains on the track (214.315(c)), so the owner or operating railroad usually provides or approves the protection. The quote should say who supplies the roadway worker in charge and the track authority, and transit agencies add their own safety rules.
What happens if part of the track couldn't be tested?
That stretch doesn't count as inspected. Before the 213.237 interval expires, the owner must arrange a valid search, cut speed to 25 mph, or replace the rail, and the report must list the location under 213.241(c)(6).
Does the testing contractor decide whether trains can run over a defect?
No. The track owner's person designated under 213.7 makes that decision and applies the remedial action from the 213.113(c) table. The contractor verifies, sizes, marks and reports the defect.
How long does it take to get the test report?
Part 213 sets no deadline for the contractor's report, so agree the turnaround in the contract. Serious defects should be reported by phone or radio on the spot, and electronic storage of the inspection record must begin within 72 hours of completing the inspection under 213.241(j)(5).
Sources
- 49 CFR 213.113, Defective rails, eCFR (text checked on Cornell LII, October 2026)
- 49 CFR 213.237, Inspection of rail, eCFR
- 49 CFR 213.238, Qualified operator, eCFR
- 49 CFR 213.240, Continuous rail testing, eCFR
- 49 CFR 213.241, Inspection records, eCFR
- 49 CFR 213.9, Classes of track, eCFR
- 49 CFR 214.315, Supervision and communication, eCFR
- Track Safety Standards; Improving Rail Integrity, 79 FR 4234 (January 24, 2014), Federal Register on govinfo
- TTCI Technology Digest TD-00-013 (2000), MxV Rail
- CPUC rail transit rules and regulations, California Public Utilities Commission